Projects
Real work for CMP, ENAMI, Antofagasta Minerals and Pucobre in Atacama and Antofagasta.

ENAMI · Atacama Region
The casting wheel building and the coal mill building, restored without stopping production.

CMP · Atacama Region
2 to 3 meters of built-up material around the entire perimeter. Manual benching, level by level, until each silo was clean and sealed.

CMP · Atacama Region
Replacement of steel and polymer plates, wear bars and ceramic sealing, within the window of each shutdown.

ENAMI · Atacama Region
When we went up to check the lighting, we found the upper structure deteriorated. We built a new platform and painted the entire stack.

Antofagasta Minerals · Antofagasta Region
Containment trays 50 meters up under the conveyor and, later, technical inspection (ITO) and first response on 14×14 rotations during the dome rebuild.

CMP · Atacama Region
With scaffolding not an option, we inspected the festoon cables on rope and found the severed cable that was causing the power outages.
Pucobre · Atacama Region
The coarse material cone and, the following year, the loading silo: structure repaired and new roofing nearly 30 meters up.