CMP · Puerto Totoralillo
Rope access inspection of the shiploader's festoon cables
- Client
- CMP
- Site
- Puerto Totoralillo · Atacama Region
- Services
- Technical inspection (ITO)

The challenge
The shiploader was suffering power outages and the cause had to be found in the festoon cables. At that point, scaffolding could not be erected and there was no other access to inspect them.
How we did it
Our rope access technicians went in on rope, under strict safety measures, and covered the full length of the cable from below. Based on what we observed, we prepared a technical report for CMP.
Photos of the work at Puerto Totoralillo