The challenge
ENAMI needed to improve the lighting at the top of the main smelter stack, about 50 meters up. No company could do it without erecting scaffolding.
What we found
Climbing up by rope to survey it, we saw that the entire upper structure had deteriorated. Some pieces came loose at the slightest touch. The job was no longer about a light fixture; it had become a risk that had to be resolved first.
How we did it
We fabricated and welded a new walkable platform at height: profiles, supports, decking and handrails, plus a new fixed ladder and the new lighting. Then we painted the entire stack red and white, with the ENAMI logo.